Roads in Hargeisa (Drone)

https://www.youtube.com/watch?v=QM_PbAI6ook

1 Like

Mayor of Hargeisa on new Road from Halaye village all paid from Local Gov’t coffers.

1 Like

One barrel of Asphald would cost about $250 and it would be enough to patch this road. Why are the citizens not taking these into their own hands instead of waiting for Governments?

1 Like

Before building any more roads they should prioritise building bridges and sidewalks.

1 Like

Several key factors contribute to these failures:

Poor Design and Planning:

  • Inadequate site surveys and improper geometric design can result in roads being built on unstable soil or flood-prone areas.

  • Lack of proper drainage systems can lead to water accumulation, weakening the road structure.

  • Low-Quality Construction Materials:

  • Substandard materials like weak aggregates, low-grade asphalt, or improperly cured concrete reduce highway durability.

  • Improper mixing and compaction can cause cracking, rutting, or potholes.

  • Corruption and Oversight Issues:

  • Corruption in tendering and construction processes may lead to the use of low-quality materials and poor construction practices.

  • Inadequate supervision and inspections can result in unnoticed defects.

  • Overloading and Traffic Concerns:

  • Overloading by trucks and heavy vehicles can exceed road capacity, causing structural damage.

  • Ineffective enforcement of weight limits worsens the situation.

  • Environmental and Climatic Challenges:

  • Harsh weather conditions accelerate highway deterioration, especially in regions with heavy rainfall or extreme heat.

  • Erosion from poor drainage or deforestation contributes to road damage.

  • Maintenance and Institutional Capacity:

  • Insufficient funding for maintenance delays repairs, allowing minor issues to escalate.

  • Weak institutional road management hinders sustainable practices and modern engineering techniques.

  • Geotechnical Challenges:

  • Building on unstable soil or landslide-prone areas poses challenges that require effective addressing during the design phase.