Somaliland oil dynamics and new export trade

somaliland oil estimate stand at 30 billion barrels oil has high pressure and needs rig to draw up oil from the well in areas such as toosan , gallol, degaan and safi and xagar areas have estimates of 2 billion to 4 billion barrels worth 312 billion dollars as Somaliansd oil commodities , new berbera refinery has a 30,000 barrel per day limit that would make around 300,000 gallons of diesel for somaliland , areas of the oil well are key and important such export pumps that are important for pump oil from the well area towards the pipeline for export and storage and 3 way separators need to divided the oil water and gas into seperate areas into pipelines by export pumps , power used on rig is around 300 kw of energy around 3.00 megawatts to 5.00 mega watts , gas lift is a oil techniques that is used when wells are older and can be used by new wells it pumps gas down wells to make oil flow more easy , gas lift oil extraction is positive for somaliland and could use gas lift oil extraction more early in somaliland oil fields , service agreement are oil agreement where country pay for the oil to be drilled say 800 million dollars in new wells , somaliland has a production agreement when production occurs ie sl10.sl13 makes oil fro wells they divided the profits and somaliland gets a cut as the host government, somaliland can produce around 10,000 barrels per day quite quickly an d fast with cpc drills and genel drills somaliland would get service agreement with other company’s in the future ,seismic data in toosan was positve for oil producing wells and producing well could be already found in somaliland and tap well, oil corporation such energy governmental departs have fines and penalty’s for oil import and different prices oil to be sold , to different countrys , somaliland is a country an can have thier own penalty for lack of oil delivery to thier own country,
somaliland would better to reach 100,000 barrles per day and get loans for oil and pay back with oil money loans such as 7 billion is possible for only 120,000 barrels per day , around 18 pump jacks is around 30000 barrels per day so around 100 pump jacks are needed for 120,000 barrles per day. gas lift is a option where it can speed flow of wells and costs around 100 million to install and is a new psoitive area ,